Learn / Wiki / Find the concept

Wiki

A colourful reference map for intelligence, transfer, cognitive capacities, measures and the evolving IQ Mindware method.

A
Attention Control
Guide to attention control, interference control and the upcoming Synergy IQ node: majority-signal training, wrapper changes, strategy cues and transfer testing.
Concept
2026-09-21
Adaptive range
Ability to switch between exploration and commitment without losing task control.
Concept
2026-02-14
C
Cognitive Control Coach (legacy)
Legacy guide to the broader combined Coach. Its functions are being separated into dedicated Synergy IQ nodes, beginning with Attention Control.
Protocol
2026-08-15
Carryover check
Transfer probe sequence using game swaps, boundary probes, and delayed re-checks.
Protocol
2026-02-18
D
Does brain training work?
Evidence-based guide to task improvement, near transfer, far transfer, cognitive-control training, relational reasoning, strategy prompts, and delayed checks.
Concept
2026-05-18
F
Far transfer
Improvement that remains visible when conditions, format, or context are changed.
Concept
2026-02-20
G
Tracker
Short matrix-style battery used to track trend direction under repeatable conditions.
Measure
2026-02-22
H
H-AGI: AI and critical thinking
How to use AI while protecting your thinking skills: build shared mental models, test assumptions and check independent understanding.
Concept
2026-10-10
How Trident G – IQ Pro works
Complete guide to the Coach-led 20-day programme: Zone Pulse, Capacity Gym, Reasoning Gym, Tracker, and Manual Mode.
Protocol
2026-04-26
I
M
Mutualism theory of intelligence
Evidence review of psychometric g, the positive manifold, cognitive networks, asymmetric developmental coupling and cognitive-niche multiplier effects.
Concept
2026-09-13
N
Network Neuroscience Theory of Intelligence
Evidence review of how distributed brain networks, flexible hubs, cognitive maps, plasticity and network controllability relate to general intelligence.
Concept
2026-09-17
P
Psi corridor
Workable state range where clarity and control can be sustained under realistic load.
Concept
2026-02-24
R
Re-entry protocol
Structured return sequence after disruption to reduce drift and restore stable execution.
Protocol
2026-02-25
S
Stop/flip rule
Predefined rule to terminate low-return grinding and switch to a better route.
Operator
2026-02-26
T
Trident-G
Domain-general intelligence architecture linking banked Gc, live Gf, exploration, exploitation, viability, expansion, and the G-Loop.
Concept
2026-04-04
W
Workable state
Operationally stable state where a user can execute protocol steps with low drift.
Measure
2026-02-28